Innolux Factory – 36 m Suspended Scaffolding Platform Renovation
INFORMATION
Project:Innolux Factory – 36 m Suspended Scaffolding Platform Renovation
Location:Taiwan, Tainan
Description:For the maintenance of a 36 m-high overhead bridge at the Innolux factory, Sucoot designed a suspended scaffolding platform using its Ring Lock Scaffolding System. Despite the elevation, the system maintained a vertical deviation within 0.3%, ensuring exceptional stability and safety. Since the factory road below needed to remain open, ground-based scaffolding was not feasible. The suspended design kept traffic unobstructed while also eliminating the cost and time of ground-up erection, providing a safe, efficient, and cost-effective solution.
Challenges
01
The bridge stood 36 m high, requiring exceptional vertical precision and structural stability.
02
Ground-based erection was impossible due to the need to keep factory roads operational.
03
The client required a solution balancing safety, efficiency, and cost control.
Sucoot's Solutions
01
Engineered a suspended Ring Lock scaffolding platform to maintain clear access below.
02
Achieved 0.3% vertical deviation even at 36 m height, ensuring structural integrity.
03
Optimized design solution to meet both safety and budget objectives.