Taipei MRT Circular Line North Section – Contract CF680C
INFORMATION
Project :Taipei MRT Circular Line North Section – Contract CF680C
Location :Taiwan, Taipei
Description :Sucoot provided multiple modular formwork and shoring solutions for the CF680C section of the Taipei MRT Circular Line North Extension.
Challenges
01
Large concrete column, wall and heavy top-slab sections over 1.0m structures demanding high load capacity and stable support.
02
Need for fast turnover between casting cycles within tight MRT construction timelines.
Sucoot's Solutions
01
Designed modular formwork systems integrating Base Beam, Top Beam, and Triangle Strut Frame.
02
Applied SCC concrete with precision-engineered configurations to achieve high finish quality.
03
Used Ring Lock scaffolding for slab shoring with full working platforms, improving safety and productivity.