Tainan Railway Underground Project – C211 & C214 Sections
INFORMATION
Project :Tainan Railway Underground Project – C211 & C214 Sections
Location :Taiwan, Tainan
Description :The Tainan Railway Underground Project (Sections C211 & C214) is part of a 5.3 km cut-and-cover tunnel designed to improve traffic flow and urban safety. Sucoot supplied single-sided wall formwork and heavy-duty shoring systems to construct 5.2 m-high tunnel walls using self-compacting concrete.
Challenges
01
Tight construction schedule for a 5.3 km cut-and-cover tunnel in an urban area.
02
Limited workspace with strict safety requirements for underground operations.
03
Need for rapid construction of large, heavy single-sided wall and top slab systems.
Sucoot's Solutions
01
Provided modular single-sided wall formwork with heavy-duty Ring Lock shoring systems.
02
Implemented an integrated movable support system with a custom rail-and-wheel mechanism for 30 m shifts.
03
Enabled continuous and safe operations using SCC concrete, reducing labor risks and boosting productivity.