China Steel Power Plant – Chimney Construction Project
INFORMATION
Project:China Steel Power Plant – Chimney Construction Project
Location:Taiwan
Description:For the new 76 m-high chimney at China Steel’s power plant, Sucoot supplied a Ø48.6 T:2.5mm Construction (Light Duty) Scaffolding to provide a stable and safe working platform throughout construction. The system was engineered to withstand strong wind loads and maintain vertical precision even at extreme height.
Following the completion of the project, the structure successfully endured the impact of Typhoon Krathon, remaining fully stable and secure — demonstrating Sucoot’s superior product strength, safety performance, and reliability under real-world conditions.
Challenges
01
Construction at a height of 76 m required exceptional stability and resistance to wind pressure.
02
Ensuring safety and precision alignment under changing weather conditions.
Sucoot's Solutions
01
Adopted Light-Duty Construction Scaffolding designed and verified for tall, high-load structures.
02
Maintained full vertical stability even after exposure to Typhoon Khanun, proving long-term structural reliability.