Project:Mong Duong Power Plant
Location:Vietnam, Quang Ninh
Description:The Mong Duong Power Plant is one of Vietnam’s key national energy facilities, supplying over 7% of the country’s total electricity output with an installed capacity of 1,240 MW. To support the massive turbine generator installation, Sucoot provided a 14-meter-high Ring Lock Shoring Scaffolding System engineered to withstand extremely heavy loads. The system safely supported the 3-meter-thick reinforced concrete slab during casting, ensuring stability and precision throughout the construction process.
Challenges
01
Extremely heavy loads from a 3 m-thick concrete slab supporting a large turbine generator.
02
Required stable and tall shoring structures (up to 14 m) under strict safety standards.
Sucoot's Solutions
01
Utilized Sucoot’s heavy-duty Ring Lock Shoring System designed for high-load industrial applications.
02
Ensured structural integrity and casting accuracy through modular design and load calculation.