Tangguh Expansion Project   

INFORMATION

Project:Tangguh Expansion Project

Type:Power Plant

Contractor:PT. PP (Persero) Tbk.

Owner:British Petroleum BP

Location:Papua, Indonesia

Method:Cast en situ

System:
Ø60.2 T:3.2mm Shoring (Heavy Duty) Scaffolding
Formwork Top Beam
Base Beam

Engineering Data

Year of Construction
2018/12 – 2020/2
Construction Period
50 months
Bridge Length (m)
42.5M
Bridge Width (m)
9.5M
Bridge Height (m)
10.7M