Taichung Expressway No.2 Huanzhong Rd(2/2)   

INFORMATION

Project:Taichung Expressway No.2 Huanzhong Rd(2/2)

Type:Highway Bridge

Contractor:Hsieh Cheng Construction Corporation LTD.

Owner:Construction and Planning Agency Ministry of the Interior , ROC

Description:3 sets material to complete a span

System:
Ø60.2 T:3.2mm Shoring (Heavy Duty) Scaffolding

Engineering Data

Year of Construction
2010~2013
Construction Period
3 years
Method
CIS
Bridge Length (m)
1860M
Bridge Width (m)
27.2M
Bridge Height (m)
11~15M
Supporting Range
Upper Structure for Bridge
Cycle Time
1 span/month