Taichung Expressway No.2 Huanzhong Rd(2/2)
INFORMATION
Project:Taichung Expressway No.2 Huanzhong Rd(2/2)
Type:Highway Bridge
Contractor:Hsieh Cheng Construction Corporation LTD.
Owner:Construction and Planning Agency Ministry of the Interior , ROC
Description:3 sets material to complete a span
Engineering Data
| Year of Construction |
2010~2013 |
| Construction Period |
3 years |
| Method |
CIS |
| Bridge Length (m) |
1860M |
| Bridge Width (m) |
27.2M |
| Bridge Height (m) |
11~15M |
| Supporting Range |
Upper Structure for Bridge |
| Cycle Time |
1 span/month |