Snap Lock
- Used for anti-drop locking and positioning between Verticals. Insert through the Joint Pin hole to keep the Verticals locked so they can’t slide out (non-load-bearing).
- Facade Scaffolding towers usually must install snap lock and may be subjected to additional tensile forces.
Stage scaffolding and shoring scaffolding do not always need a snap lock. - Shoring scaffolding does not always require a snap lock, but if the shoring scaffolding is erected using the ground-assembled lifting method, a snap lock will be needed.