WELCOME TO SUCOOT GROUP

WELCOME TO SUCOOT GROUP

Cimanggis – Cibitung Highway Section 2

  • Project :Cimanggis – Cibitung Highway Section 2
  • Type :Highway Bridge
  • Contractor :PT. Waskita Karya Tbk.
  • Owner:PT. Waskita Toll Road (WTR)
  • Location:Palembang, Indonesia
  • Method:Cast en situ
Year of Construction 2019/1 ~ 2019/12
Construction Period 12 months
Bridge length (m) 32.8M
Bridge width (m) 5.0M
Bridge height (m) 10.6~12.4M
Ø60.2mm Shoring(Heavy Duty)
Formwork Top Beam& Base Beam