Cimanggis – Cibitung Highway Section 2
INFORMATION
Project :Cimanggis – Cibitung Highway Section 2
Type:Highway Bridge
Contractor :PT. Waskita Karya Tbk.
Owner:PT. Waskita Toll Road (WTR)
Location:Palembang, Indonesia
Method:Cast en situ
System:
Ø60.2 T:3.2mm Shoring (Heavy Duty) Scaffolding
Top Beam
Base Beam
Engineering Data
| Year of Construction |
2019/1 ~ 2019/12 |
| Construction Period |
12 months |
| Bridge Length (m) |
32.8M |
| Bridge Width (m) |
5.0M |
| Bridge Height (m) |
10.6~12.4M |