National Freeway NO.1(Luzhu to Airport System Interchange)   

INFORMATION

Project:National Freeway NO.1(Wugu to Taishan)

Type:Highway Bridge

Contractor:New Asia Construction & Development Corp.

Owner:Taiwan Area National Expressway Engineering Bureau

Description:1 sets material to complete a span

System:
Ø60.2 T:3.2mm Shoring (Heavy Duty) Scaffolding
Formwork Top Beam
Base Beam

Engineering Data

Year of Construction
2009-2012
Construction Period
3 years
Method
CIS
Bridge Length (m)
350M
Bridge Width (m)
12.5M
Bridge Height (m)
10~15M
Supporting Range
Upper Structure for Bridge
Cycle Time
1 span/month