Jakarta – Cikampek Elevated Toll Road   

INFORMATION

Project :Jakarta – Cikampek Elevated Toll Road

Type:Highway Bridge

Contractor :Waskita

Owner:Waskita

Location:Jakarta, Indonesia

Method:Sosrobahu Technique

System:
Ø60.2 T:3.2mm Shoring (Heavy Duty) Scaffolding

Engineering Data

Year of Construction
2018/2 ~ 2019/3
Construction Period 
Estimate End 2019/3
Bridge Length (m)
Cap beam length 18.05m
Bridge Width (m)
Cap beam width 3.0m
Bridge Height (m)
7.5m ~ 14.0m
Supporting Range
Slab thickness 3.25(mid cap)~ 1.4(side)
Formwork Range
21m x 4.75m