| Year of Construction | 2018/5 ~2019/6 |
|---|---|
| Construction Period | 13 months |
| Bridge length (m) | 11.05M |
| Bridge width (m) | 3.54M |
| Bridge height (m) | 7.5M |
| Supporting Range | Scaffolding range 9.73m x 4.5m Cap bean thickness 3.24m |
| Cycle time | 2018/6 ~ 2018/9 |
| Precast size | Slab thickness 40cm |





