  • Project?GHaikou City Jiangdong Ave., underground box culvert
  • Location: Haikou City, China
  • Client?GThe First Engineering Co., LTD of CTCE Group
  • Product?GForm: Base Beam & Top Beam; Shoring: ?p60.2mm Shoring Scaffolding
  • Remark?G#Mobile Formwork System, #easily drop mold, demolding and move

The Chinese Government declares new serial underground box culvert infrastructure start from 2015. To avoid consistently damage the road and block traffic, the plan is to build underground box culvert over 389 kilometers, contain electricity, communications, gas, water supply, sewage pipelines.

Haikou city is one of the ten pilot cities to start the structure. The goal was to build total length 43.24 kilo underground culvert within 3 years. Among various box culvert methods such as traditional form type, TBM etc., Sucoot was selected and participated in the cast-in-situ project. The client demands to build as whole culvert as the wall and ceiling together plus without tie rods. As solution Sucoot provide Mobile Formwork System, mainly it??s the combination of Top Beam, Base Beam and Ring System Scaffolding. It can be easily down mold, demolding and move away by man push on wheel.

The project length total 6.8 kilo, demand duration within 6 months. By using Sucoot??s Mobile Formwork System it completely in 2.5 months, an over 50% time saving.

According to real site analysis if 20 meter standard segment, compare to traditional formwork system, Sucoot save 33% time, 40% human cost, 25% machine cost.