| Year of Construction | 2018/2 ~ 2019/3 |
|---|---|
| Construction Period | Estimate End 2019/3 |
| Bridge length (m) | Cap beam length 18.05m |
| Bridge width (m) | Cap beam width 3.0m |
| Bridge height (m) | 7.5m ~ 14.0m |
| Supporting Range | Slab thickness 3.25(mid cap)~ 1.4(side) |
| Formwork Range | 21m x 4.75m |





